Indiana, veri merkezi moratoryumunu...?
SiyasetAIDurumlarTeknolojiIndianaHesaplaYapay Zeka YönetmeliğiAI Bubble
Başlangıç tarihi
2026-09-29
Bitiş tarihi
2029-01-01
24 sa hacim
$4K
Toplam hacim
$6.4M
  • Indiana, 31 Aralık 2026'ya kadar veri merkezi moratoryumu ilan edecek mi?2¢%2
  • Indiana 30 Haziran 2027'ye kadar bir veri merkezi moratoryumu ilan edecek mi?11¢%11
  • Indiana, 31 Aralık 2027'ye kadar veri merkezi moratoryumu uygulayacak mı?17¢%17
  • Indiana, 31 Aralık 2028'e kadar bir veri merkezi moratoryumu ilan edecek mi?31¢%31

Local opposition to data center growth, fueled by AI-driven demand for power and water, has produced moratoriums or restrictions in over half of Indiana counties plus Indianapolis through late 2027, yet no statewide ban has passed. State bills such as HB 1333 stalled in 2026, with only limited revenue-sharing measures enacted, while the next legislative session opens in January 2027. Traders price near-term enactment low because the current session is ending and local actions already address many siting concerns without requiring statewide intervention. Key swing factors include utility rate impacts from large loads and any new grid or environmental studies that could prompt broader legislation.

Kurallar

This market will resolve to "Yes" if the State of Indiana enacts a law or constitutional provision that establishes a statewide moratorium on new data centers between market creation and the specified date, 11:59 PM ET. Otherwise, this market will resolve to "No". A statewide moratorium on new data centers refers to a binding policy with legal force that generally prohibits or suspends the approval, permitting, construction, grid interconnection, or operation of all new data centers, or a subset of data centers that includes all new data centers with an interconnection capacity above 100 MW per facility (requested or nameplate), throughout the state. Suspensions of tax incentives, exemption certifications, or economic development awards alone will not qualify, nor will a moratorium adopted by a local government or limited to part of the state. Specific exemptions (e.g., for specified applications, executed agreements, or interconnection requests) do not prevent a measure from generally applying to all new data centers, or a qualifying subset of new data centers, provided that data center approval, permitting, construction, grid interconnection, or operation is prohibited by default, rather than permitted subject to conditions or restrictions. Conditions on the resumption or termination of a suspension do not make a measure one that permits subject to conditions; a measure that suspends approvals, permitting, construction, or interconnection until a specified condition is satisfied qualifies. Enactment occurs when a bill becomes law under the state's constitution and laws, whether by gubernatorial signature, veto override, becoming law without signature, approval at a statewide referendum election, or any other legal mechanism by which statutes can be enacted. For an initiated or referred statute or constitutional amendment, or other voter referendum, the relevant law is considered to have been enacted on the election day on which it was approved, as reflected in the certified results, regardless of when the measure is certified or takes effect. Passage by one or both chambers, or a Governor's announced intent to sign, is not enactment. Executive orders, agency orders, and other measures which are not statutory or constitutional do not qualify as enactment regardless of legal force. A provision removed by line-item veto is not enacted unless the veto is overridden as to that item. The operative text of the measure at enactment controls; provisions amended out before enactment do not qualify. The moratorium provision must be mandatory on its face. A statute that merely authorizes a state agency or the Governor to impose a moratorium at their discretion does not qualify. A statute that directs suspension of approvals or interconnection upon a specified condition qualifies only if the condition is objectively determinable and is not deferred to be determined by the implementing agency's findings, certifications, or completion of its own proceedings. This market resolves based on the date of enactment, not the effective date. Resolution will not be affected by failure to implement a law, judicial invalidation, repeal, or expiry that follows a relevant enactment, or an effective date that comes after the date of enactment. The primary resolution source will be official information from the state government of Indiana; however, a consensus of credible reporting may also be used.

Indiana, veri merkezi moratoryumunu...?

Benzer piyasalar