Tight supply of high-bandwidth memory and sustained AI inference demand continue to support elevated H200 rental rates, with current on-demand medians around $4.25–$5.35 per GPU-hour across neoclouds and marketplaces as of late November 2026. The Hopper-based H200’s 141 GB HBM3e capacity gives it an edge over the H100 for memory-bound workloads like large-context LLM serving, while Blackwell B200 capacity remains largely allocated at higher rates near $7.50–$8.60. Rising server and memory component costs, plus NVIDIA’s planned price adjustments effective February 2027, add upward pressure. Spot and marketplace listings trade lower, but overall trader consensus reflects limited near-term relief until broader Blackwell or Rubin volumes arrive later in 2027.
如果2027年2月的Ornn H200指数平均值高于指定价格,本市场将结算为“是”。否则,本市场将以“否”结算。 2027年2月的Ornn H200指数平均值,是Ornn发布的、日期在2027年2月内的Ornn OCPI-H200指数每日最终结算值的算术平均值,并四舍五入到最接近的美分。每日结算值在次日的结算值发布后,即视为最终确定。在某个值最终确定后进行的修订将不予考虑。 本市场的结算来源是Ornn(data.ornn.com),具体为Ornn的H200计算价格指数(OCPI-H200),目前显示在https://data.ornn.com/markets/h200。 如果结算来源发布了足以结算市场、但明显错误的数据,且该错误源于技术或运营错误,或源于对结算来源或其数据的未经授权干扰,则市场可从预期原始发布时刻起,在等待结算来源进行更正的情况下,继续开放最多七(7)个日历日(ET)。如果Resolution Source在该期限内发布了更正后的数值,该数值即可用于结算。 如果2月份的任何数值在2月结束后的第7个日历日23:59 ET之前仍未最终确定,本市场将使用届时可用的最终数值进行结算。 如果Ornn停止发布OCPI-H200指数、页面变得无法访问,或Ornn实质性改变指数的方法或计量单位,并因此在2027年3月7日的23:59 ET之前没有任何日期在2027年2月内的最终OCPI-H200值可用,则将考虑其他可信的H200租赁价格数据来源。如果没有此类来源,本市场将按50-50结算。
机器翻译。如有争议,以原文为准。